Description
- Renewal of the guard post is from crew No.42.
- With the renewal, we will hang the package bag and formula.
- We will add the cutout parts.
- Take two buildings
Guide - paint:
External wall: SP-09, 14,21, etc.
Roof and: SP-06, 09,20,39, etc.
-Foundation, water fountains such as: SP-09, 14
• Shutter: such as SP-14, 42
· Window frames such as: SP-08, 39
- Dimensions: (W) 82mm × (D) 40mm